Sign In
New User? Sign Up
CanalScapeBCN · CanalScape-BCN
? Already a member? Sign in to Yahoo!

Yahoo! Groups Tips

Did you know...
You can set the sort order of messages? Just click on the link in the date column. Your preferences will be remembered, so you don't have to do it again when you return.

Messages

  Messages Help
Advanced
Former hovel at Spon Lane Lock 3   Message List  
Reply | Forward Message #125 of 613 |
British Waterways are currently undertaking major conservation repairs at
Bromford
Junction on the Grade II listed Horseley Iron Works bridges located at the site.
The
repair works include the repointing of brickwork, repair of the cast iron
including
repainting and access improvements to the bridge decks.

Whilst the contractors are present at the site it is proposed that the brick
hovel located at Spon Lane Lock 3 is made structurally sound. To
conserve the structure in its present state its existing concrete roof
has to be removed and the remaining brickwork needs to be repointed with
lime mortar. The repair  and stabilisation works to the structure will
be kept to an absolute minimum and aim to conserve the former hovel as
part of this important historic site.

British Waterways welcomes your views on the proposal to remove the
existing concrete roof which is a relatively modern addition to the hovel. If
you wish
to contact British Waterways directly about the proposal then please email
elizabeth.turner@...

Kind regards

Elizabeth Turner
Heritage Adviser

West Midlands Waterway





Tue May 22, 2007 4:47 pm

aberporthejt
Offline Offline
Send Email Send Email

Forward
Message #125 of 613 |
Expand Messages Author Sort by Date

British Waterways are currently undertaking major conservation repairs at Bromford Junction on the Grade II listed Horseley Iron Works bridges located at the...
aberporthejt
Offline Send Email
May 22, 2007
4:48 pm

Thanks for this, Elizabeth. Can you clarify one aspect? Is it suggested that the (inappropriate) roof should be and be replaced by one more in keeping - or be...
John Dodwell
johncdodwell
Offline Send Email
May 22, 2007
8:49 pm

To clarify the proposed works to the hovel at Spon Lane Lock 3: It is not the intention to replace the existing roof with a new roof. There are several factors...
aberporthejt
Offline Send Email
May 23, 2007
8:37 am
Advanced

Copyright © 2009 Yahoo! UK. All rights reserved.
Privacy Policy - Terms of Service - Guidelines - Help