Sign In
New User? Sign Up
cbm-sweden · Tillståndstyrt underhåll - CBM
? Already a member? Sign in to Yahoo!

Yahoo! Groups Tips

Did you know...
You can add links to your Web sites related to your group?

Messages

  Messages Help
Advanced
Prediction of system reliability for single component repair   Message List  
Reply | Forward Message #1274 of 1350 |
 
Title: Prediction of system reliability for single component repair
Author(s): Yong Sun, Lin Ma, Joseph Mathew
Journal: Journal of Quality in Maintenance Engineering
ISSN: 1355-2511
Year: 2007 Volume: 13 Issue: 2 Page: 111 - 124
DOI: 10.1108/13552510710753023
Publisher: Emerald Group Publishing Limited
 
Abstract: Purpose – The purpose of this article is to present a new split system model (SSM) that predicts the reliability of complex systems with multiple preventive maintenance (PM) actions in the long term.

Design/methodology/approach – The SSM was developed using probability theory based on the concept of separating repaired and unrepaired components within a system virtually when modelling the reliability of the system after repairs. After theoretical analysis, a case study and Monte Carlo simulation were used to evaluate the effectiveness of the newly developed model.

Findings – The model can be used to determine the remaining life of systems, to show the changes in reliability with PM actions, and to quantify PM intervals after imperfect repairs.

Practical implications – SSM can be used to predict the reliability of complex systems with multiple PM actions, and hence can be used to support asset PM decision making over the whole life of the asset, such as scheduled PM times and spare parts requirements. An asset often has some vulnerable components, i.e. where the lives of these components are much shorter than the rest of the asset. In this case, PM is often conducted on these vulnerable components for maximising the useful life of the asset. The specific formulae derived in this paper can be used to predict the reliability of the asset for this scenario.

Originality/value – The proposed model uses a new concept of split systems to predict the changes of reliability of complex systems with multiple PM actions. Asset managers will find this model to be a useful tool in the optimisation of their asset PM strategies.
 
--------------------
 
Göran Wikingson
Internetklubben CBM-Sweden
Tillståndsbaserat Underhåll - Condition Based Maintenance - Industriell IT


Sun May 27, 2007 5:25 pm

cbm-sweden-owner@yahoogroups.com
Send Email Send Email

Forward
Message #1274 of 1350 |
Expand Messages Author Sort by Date

http://www.emeraldinsight.com/Insight/viewContentItem.do?contentType=Article <http://www.emeraldinsight.com/Insight/viewContentItem.do?contentType=Articl ...
CBM-SWEDEN
cbm-sweden-owner@yaho...
Send Email
May 27, 2007
5:47 pm
Advanced

Copyright © 2009 Yahoo! UK. All rights reserved.
Privacy Policy - Terms of Service - Guidelines - Help